Arkad Hotel Room Application

Rating
Business
GooPlast
Category
Concrete Forming and Scaffolding > Building Materials
Price
price not defined
Minimum Order
1
Maximum Order
Unlimited
Unit
Countries sellable to
Afghanistan, Aland Islands and 248 more

Arkad Permanent Formwork system, in accordance with the principle of minimum cost and maximum benefit, which constitutes the basic values ​​of lean construction, creates spaces under the screed of mechanical and electrical cable trays, sanitary installation pipes in new or renovated residences and workplaces, offices, business and shopping centers in order to increase efficiency. It is a concrete and reinforced concrete raised floor system with high load carrying capacity. It is a cost-effective and time-saving raised floor solution that can be used under screed in buildings, produced from recycled plastics that can be adjusted to the desired height, with a minimum of 8.5 cm without feet and 12 cm with feet.