The AST-50 Exterior Cleaning System (BMU) of Al Mana Edition, which is under construction in Qatar, was tested at the Ademsan Machinery Factory.
In buildings with a height of 40 meters or more from the ground, the platform
are fixing systems used for safety.
• In accordance with the height of the building, the first 40 meters, then each
It is applied every 20 meters.
• Application frequency can be increased according to demand.
• On the horizontal, depending on the platform width, on average each
It is applied every 2 meters.
• Connection places and distribution of sockets by our engineers.
is designed in detail.
ADEMSAN-Electric Suspended Scaffolding
Proforti - Bidirectional sliding elevator safety brake Forti Asansör
Proforti Forti Asansör
Otomat Çelikleri ERC Otomat Demir & Çelik
Macroscopy Cabinet Stahl MFG
Trapez sac ve osb uygulamalar KAYGUN METAL
Cephe Temizlik Sistemleri ADEMSAN-Electric Suspended Scaffolding
SALES OFFICES 1005 M² Invitation Hall USTA LIGHT STEEL STRUCTURES
Stainless Steel Plate Ucel Steel