Facade Fixing - Rail Section electric suspended scaffolding

Facade Fixing - Rail Section electric suspended scaffolding

The AST-50 Exterior Cleaning System (BMU) of Al Mana Edition, which is under construction in Qatar, was tested at the Ademsan Machinery Factory.

In buildings with a height of 40 meters or more from the ground, the platform

are fixing systems used for safety.

• In accordance with the height of the building, the first 40 meters, then each

It is applied every 20 meters.

• Application frequency can be increased according to demand.

• On the horizontal, depending on the platform width, on average each

It is applied every 2 meters.

• Connection places and distribution of sockets by our engineers.

is designed in detail.