Bigadiç Boron Operational Directorate Simav Open Quarry Stripping Project (2003-2004) ; The scope of works included loosening, excavation, loading, transportation to dumping area, dumping and leveling of overburden at Bigadiç Boron Operational Directorate Simav Open Quarry and construction and maintenance of the required roads within the confines of the Quarry.
Şişli Mika 28 Mika İnşaat
NATURALİST 2 EXCELLENT LOCATION Mika İnşaat 2
Mika Naturalist 2 Mika İnşaat
SİYAH KULE Mayra Yapı İnşaat
MARIN PARK SEVGILI KONUTLARI SEVGİLİ BUILDING
MERDİVENKÖY BUTİK52 Mayra Yapı İnşaat
Mika Naturalist Mika İnşaat
Teknur Tekstil Yeni Yönetim Binası Mayra Yapı